Verifications HTM 03-01 Part B

Ventilation systems within a hospital or healthcare facility must comply with ‘Health Technical Memorandum 03-01- ‘Specialised Ventilation in Healthcare Premises’ commonly referred to as HTM 03-01.
AirisQ have over 30 years’ experience in healthcare verifications. We are currently working with over 50 NHS Trusts and routinely perform thousands of verifications annually.

Verifications HTM 03-01 Part B

Ventilation systems within a hospital or healthcare facility must comply with ‘Health Technical Memorandum 03-01- ‘Specialised Ventilation in Healthcare Premises’ commonly referred to as HTM 03-01.
AirisQ have over 30 years’ experience in healthcare verifications. We are currently working with over 50 NHS Trusts and routinely perform thousands of verifications annually.

Verifications HTM 03-01 Part B

An annual assessment of a ventilation system’s performance must be undertaken in accordance with HTM 03-01. The verification process is a way of ‘verifying’ (confirming) the performance of a ventilation system, ensuring the system is functioning to an acceptable performance level and is ‘fit for purpose.’ A verification is required annually at a minimum but in some circumstances may need to be carried out more frequently.

What is included in a verification by AirisQ?

Our engineers are fully trained as ‘authorised persons’ in HTM 03-01 verification AP(V) (City & Guilds Authorised Person HVAC) and have extensive experience testing diverse types of critical areas, including but not limited to conventional and ultra clean ventilation (UCV) Theatres.

All testing services detailed below use equipment calibrated according to industry standards and AirisQ can provide copies of calibration certificates if required.

Our verification includes:

  • HTM 03-01 AHU inspection
  • HTM 03-01 area served inspection
  • Room schematic & calculation of supply & extract room air changes
  • Measurement & analysis of room pressure differentials
  • Duct traverse readings
  • Measurement & analysis of airflow velocity and volumes
  • UCV velocity counts at 1m & 2m
  • Interim reports issued by our engineers the day following their site visit
  • A final comprehensive visit report, with tailored recommendations and an action plan for maintenance works
  • Online data centre for easy 24/7 unlimited client access to all current & archived reports

Benefits of using AirisQ for your HTM 03-01 verification?

No loss of operating time

AirisQ can work overnight/out of hours.

Independence

Providing an expert impartial assessment.

Respected

Professionals with extensive industry experience.

Efficient

Fast turnaround with minimal service disruption.

Z

Compliance documentation

Expertly produced to satisfy auditors.

Identifying Faults

AirisQ operates a fix-as-we-go policy, helping rectify issues fast.

Optional Extras

  • Particle counting
  • Filter integrity testing (DOP) of HEPA filters fitted (supply/extract or UCV canopy)
  • UCV preliminary checks
  • Full UCV service
  • Microbiological air sampling
  • Settle plates
  • Surface contact plate testing
  • Customised summary spreadsheet

We offer competitive daytime and out of hours rates that offer minimal disturbance to our clients.

    Other services we can help with

    HTM 03-01 Validation

    Commissioning & Balancing

    UCV Servicing

    Microbiological Sampling

    Reach Out To Us

     

    01322 273158